抽象的

An integrated three-dimensional model on financing risk evaluation for PPP power plant projects based on WSR

Li Ping, Bai Bing


This article starts from the risky factors that influence the smooth running of PPP power plant project financing, such as insufficient income, changes in interest rates and so on. On the basis of previous studies, we develop an integrated three-dimensional model for financing risk evaluation of PPP power plant projects based on the WSR systems methodology, so that its "past", "present" and "future" are organically combined. Verifications in case studies show that this model effectively solves the evaluation problems for PPP financing risk and it can make risk control better.


索引于

  • 中国社会科学院
  • 谷歌学术
  • 打开 J 门
  • 中国知网(CNKI)
  • 引用因子
  • 宇宙IF
  • 研究期刊索引目录 (DRJI)
  • 秘密搜索引擎实验室
  • 学术文章影响因子(SAJI))
  • ICMJE

查看更多

期刊国际标准号

期刊 h 指数

Flyer