抽象的

Risk assessment research on an electric power project used Monto-Carlo-NPV mothed

Ning Yao


The risk was distinguished in a electric power project in the paper, the main risk factors were analyzed and those factors were changed into the useful parameters for NPV model by using Monte Carlo-NPV mothed, then the main economic indexes of the project such as NPV, IRR were calculated to confirm the project’s feasibility and the risk degree. Through the sensitivity analysis of the main economic indicators of NPV, IRR on the various risk factors, the risk factors of greater influence were selected to be managemented and avoided to reduce or avoid enterprise’s risk. The results showed that the Monte-Carlo-NPV mothed was a practical and feasible mothed for risk analysis


免责声明: 此摘要通过人工智能工具翻译,尚未经过审核或验证

索引于

  • 中国社会科学院
  • 谷歌学术
  • 打开 J 门
  • 中国知网(CNKI)
  • 引用因子
  • 宇宙IF
  • 研究期刊索引目录 (DRJI)
  • 秘密搜索引擎实验室
  • 欧洲酒吧
  • ICMJE

查看更多

期刊国际标准号

期刊 h 指数

Flyer